Take Command of Your
Test Fleet.
From deciding what to build to proving what was tested, Fleetwise secures the digital thread to maximize asset utilization and data integrity.
Capture the data that falls between spreadsheets.
You have robust Systems of Record for Design (PLM) and Requirements (ALM), but the physical reality is a messy, out of sync, blind spot.
Fleetwise is the System of Record for Physical Validation, the layer that ties real-world assets back to engineering intent, ensuring your compliance evidence is complete, traceable, and audit-ready.
Regulation
GSR2 / UNECE R157STATUS: MANDATORYRequirement
ELKS_Validation_v2Scope: >100kphAsset
Proto-X7 (VIN..8842)HW/SW: v2.1 | v4.0.2Request
Request #4921Engineer: S. MillerEvidence
Compliance Record: #921Audit-ReadyRegulation
GSR2 / UNECE R157STATUS: MANDATORYRequirement
ELKS_Validation_v2Scope: >100kphRequest
Request #4921Engineer: S. MillerAsset
Proto-X7 (VIN..8842)HW/SW: v2.1 | v4.0.2Evidence
Compliance Record: #921Audit-ReadyEnd-to-End Fleet Orchestration.
Asset Management
A digital twin for every VIN. Track software versions, hardware builds, and location history.
The Request Portal
Standardize the input. Engineers request vehicles with specific criteria, ensuring the right tool for the job.
Dynamic Allocation Engine
Turn months of planning into minutes. The engine automatically maps complex requirements to your fleet, optimizing the schedule in real-time.
Bulk Operations
Manage mass-updates and fleet imports via CSV or API. Built for the scale of OEM testing.
Compliance & Logs
Automatic audit trails. Every booking and status change is logged for complete accountability.
See Fleetwise in Action.
Watch how teams manage complex fleet operations in real-time.
The Self-Healing Schedule.
Never miss a Mandatory Requirement. Coming Soon
Talk to your fleet. Literally.
Perhaps you need to find 'all UK Market, Red Protos with ADAS High available next week', or need help navigating a complex booking, just ask. Oscar interprets natural language to provide immediate answers without the email chain.
Stop managing million-dollar assets with ten-cent tools.
The Wiser Way
- Single Source of Truth
Live, unified data accessible to the whole team. - Real-Time Synchronization
Changes propagate to every engineer instantly. - Traceable Evidence
Automated linking of Assets, Builds, and Test Results. - Proactive Resolution
Oscar prevents conflicts before they happen.

Fleet Coordinators
Automated allocation & planning
Managers
Timeline visibility & conflict resolution
Engineers
Transparent access & status tracking
Compliance Teams
Proof of due diligence in one click
*(coming soon: Compliance Traceability)
Directors
Program risk & utilization metrics
What's Inefficiency Costing You?
Configure your fleet and team parameters to see your estimated annual cost of coordination overhead.
Built for High-Stakes Engineering.
Data Sovereignty
Your IP remains yours. Secure, isolated instances available.
Role-Based Access
Granular permissions for Admins, Engineers, and View-Only users.
Audit Ready
Every booking, edit, and allocation is logged for complete accountability.